KUSTOM CHROME MACHINE – CHROME MIRROR PURE) to apply with any of our SYSTEMS OF CHROME-plated PURE
Full Kit of 18 litres, enough to cromar between 30-35 m2 approximately. (What compounds chromium G4 and G5 come in a concentrate to mix in distilled water to obtain 18Lts total for each product).
Women's clothing size
| Size | XS | S | M | L |
|---|---|---|---|---|
| Euro | 32/34 | 36 | 38 | 40 |
| USA | 0/2 | 4 | 6 | 8 |
| Bust(in) | 31-32 | 33 | 34 | 36 |
| Bust(cm) | 80.5-82.5 | 84.5 | 87 | 92 |
| Waist(in) | 24-25 | 26 | 27 | 29 |
| Waist(cm) | 62.5-64.5 | 66.5 | 69 | 74 |
| Hips(in) | 34-35 | 36 | 37 | 39 |
| Hips(cm) | 87.5-89.5 | 91.5 | 94 | 99 |
With your arms relaxed at your sides, measure around the fullest part of your chest.
Measure around the narrowest part of your natural waist, generally around the belly button. To ensure a comfortable fit, keep one finger between the measuring tape and your body.
KIT CHROME FULL Included:
2 L. KIT basecoat CB-5/7 with catalyst and solvent
2 L. KIT Special Varnish CF-4 with catalyst and solvent
1 L KIT UHS P8-80 ultra-fast varnish with catalyst to obtain extra protection on parts with a high exposure to the outside such as wheels, tanks, nautical parts,...
1/2 Pre-Activator
1/2 Activator
18 L. Silver A (served in concentrate)
18 L Silver Reducer B (served in concentrate)
Please describe what base layer you prefer:
CB-5: The most new developed. Maintains the adhesion of the chrome to 100%. ESSENTIAL to dry it at 60 ° c for 2.5 Hrs. You can't air dry
CB-7: base Layer of air-drying (24/48 hrs). In times of high heat with 1 day drying is sufficient. With cold, best to let dry for 2 days minimum.